OUR PROCESS
Construction Process
Hover to Learn More
1. Pre-construction meeting

This meeting is held via virtual meeting, or in person, and will be the introductory meeting with your Project Manager. From this meeting we will create redline changes to the plans that the Residential Designer will make before issuing the final construction set. Any changes made during this meeting will be finalized through a Change Order. You will also receive an introduction and demonstration on the use of BuilderTREND
4. Insulation and drywall

Phase 4 is busy with insulation install, energy inspections, shower wall installation by our tile contractor, drywall, and exterior stone work. We will also provide paint sample stickers for you to place throughout the home so that you may review and approve paint colors after drywall.
7. Homeowner walk-through
and punch list

Phase 7 is when you walk through your new home with your Project Manager, in a detailed and thorough manner, to blue tape and notate any punchlist items in need of correction.
2. Site work/prep, framing
and foundation

Phase 2 is when the real work begins as we discuss site work, confirm home placement for foundation form set, frame, cornice, windows/doors, septic location, well and storage tank location (if applicable), propane location (if applicable), utility locations, as well as any future site needs.
5. Interior finish

Phase 5 will take place after we conduct an internal pre-finish meeting where our team (Project Manager, Interior Designer, Sales Manager and Purchasing Coordinator) will review all aspects of the finish out of your home, aka the “pretty things”! At the Phase 5 meeting, your Project Manager will meet you onsite to discuss tub & shower surrounds, shower floors, interior paint, cabinet install, counter tops, glass (shower doors and mirrors), flooring and will conduct our custom trim walk to design your closet layouts.
8. Homeowner orientation
and acceptance

Phase 8 is the BIG day! We will review completion of punchlist, execute all completion documentation, ensure that you receive a full orientation of your new home and finally hand over the KEYS! CONGRATULATIONS!
3. Mechanicals, masonry, and
roof

Our Phase 3 Meeting is the big one everyone gets excited for! Your Project Manager will arrange the plumber, electrician and low voltage contractors to meet you both onsite to review their scope of the project, discuss any desired changes you may have and ensure everyone is on the same page. Also covered at this time is the stucco process and exterior painting, roof installation, HVAC layout and thermostat location(s), shower/tub niche locations, fireplace(s) and our overall inspection process.
6. Trim & appliances

Phase 6 is when we discuss the installation of your electrical and plumbing fixtures, appliances, concrete flatwork/steps, railing (if needed), as well as the general timeline for completion.
Our Process
Construction Process
To learn more, Click the Photo